уторак, 7. фебруар 2017.

Business proposal for Aqua Park

Introduction


The aim of this paper is to present research analysis for what appears to be an excellent investment opportunity – Aqua Park in Palić. Lake Palić is situated 8 km from Subotica, in the northernmost part of Serbia, 10 km away from the border with Hungary, and just 50 km from Romanian border. The main approach to the lake is the highway E-75 (Horgoš – Novi SadHo). The approach is simple both for the visitors and catering. Near the lake, there is the attractive Palić Zoo, the only one in Vojvodina, with 65 animal species including polar bears, lions and elephants.

I believe that the best possible location for Aqua Park is near this lake, for numerous reasons, which I will explain in this proposal.

The object I am proposing is a pool complex, organized in the form of an open Aqua Park. The open Aqua Park is to be built on construction land comprising the space of 3 hectares, or 30.000 m2. It is meant for water games and should consist of 5 theme units (a pool with waves, a larger pool with toboggans, a smaller pool with toboggans, a swimming pool and a children’s pool) as well as necessary additional objects and resting places, such as open showers, sanitary objects, catering facilities and paved and sand areas for sunbathing and relaxation.

There shoul be also a parking lot of roughly 600 vehicles capacity, spreading over the area of 12 000 m2, defined by the regulation plan of Subotica and located near the entrance of the complex. The most modern equipment for this form of fun should be installed, together with the new pool technology and water game devices. Attractive architecture solutions must applied, as well as a modern design of space, construction elements and equipment, high level of final processing and a sophisticated management system.

Analysis of supply and competition


As for the general supply of Aqua Parks, the existing Aqua Parks are mainly complexes of swimming pools with accompanying content – food facilities, restaurants and cafes, sports fields etc. of small capacity, open type, which work only during summer time and whose visitors are mainly locals. On our gravitational area (80 km) there is no open type Aqua Park. Also, on wider gravitational area (160 km+), as well as the neighbor countries (Bosnia, Croatia) there is no open type Aqua Park supply with the content presented in the Palić Aqua Park. There are also open pools in surrounding cities but in comparison with our open Aqua Park, they are of vanishingly small dimensions.

If our object would comprise the following content:
-          A pool with waves 1060 m2
-          A pool with toboggans, smaller 180 m2
-          A pool with toboggans, larger 270 m2
-          A swimming pool 1150 m2
-          A children’s pool 980 m2
-          Catering services
-          Open showers
-          Sanitary objects
-          Paved and sandy areas for relaxation and sunbathing

it can be freely said that the open pools in cities mentioned above, will not present competition, even as substitutes for our total catering supply, which in addition to the swimming and children’s pools, will also include various content exclusively meant for relaxation of different categories of consumers/customers, starting from children of 3 to 12 years of age, through teenagers, to adults and seniors.

Based on all above mentioned, it may be easily deduced that the current supply of open-type Aqua Parks on this gravitational area is nonexistent.  Aqua Parks of similar type exist in neighbor countries (like Croatia) but they are too far away to be potential competition. Besides, the future offer of open type Aqua Parks like the one I am proposing, with various and rich content will also be limited, because their development and running requires substantial financial investments.

Analysis of competition threat


There are no companies that can compete with their offer and content with the services that will be provided for the consumers in our complex which will consist of an open Aqua Park. Thus, the stressed distinctive competence, as well as the thermal waters exploitation, which provides us with green and cheap energy is our biggest and unreachable competitive advantage. The construction land on which the Aqua Park is to be built is equipped with complete infrastructure and is currently owned by “Zdravica” Company which will be one of the founders of the new “Aqua World” Company, which will influence the activities of current and future competition which would have to spare significant financial resources for the purpose of purchasing land on which to build the complex of similar design, purpose and dimensions, so that we can freely say that the entrance barriers for competitions are substantial. If we take into consideration the concessions for exploiting geothermal waters which will be used for heating the pools and which have sources near our Open Aqua Park, the realization of our project is clearly economically justified.

Market attractiveness analysis and sources of competition advantages


No city that belongs to our gravitational area has an open-type Aqua Park. Besides, an Open Aqua Park built on Palić will be clearly differentiated in comparison with other objects of similar purpose, because it will offer something new, something that other objects do not have.

Considering that you[1] have a significant business experience in Serbia as well as abroad, it is a guarantee that the marketing and management aspects will be wisely and rigorously conducted. Involvement in investment of the open park is a special indication of the marketing investment in order to acquire concurrent advantages, i.e. to attract customers/consumers. In addition, the large parking space, completeness of the supply assortment, relaxation options, and fun for children and pleasant pastime for adults represents a significant competition advantage.

Considering that the Palić Open Aqua Park’s critical success factor is, we take it, the transparent attractiveness of our offer for the consumers/customers, a lot of attention must be dedicated to promoting the mentioned objects as a place for pleasant and affordable vacation, fun and recreation.

The Palić Aqua Park should have the following content in order to enable it to create a sustained concurrence advantage in a longer period of time:
  • The open Aqua Park should be a fun place during the entire summer season. In addition to the described pools, there should be a vast choice of pastime, pleasure and relaxation types manifested through the presence of all auxiliary facilities that such a representative object implies. Also, the auxiliary objects (restaurants, hotels, cafes) must be built so that the guests coming from nearby towns and countries can be accommodated.
  • The open Aqua Park should contain all the objects necessary for providing services of that type, which will have a synergetic effect on completing the unique offer from the aspect of total concurrence advantage.

The aim is to transfer the epicenter of events connected with recreation, relaxation and fun onto the location of our Aqua Park, not only from the towns of the gravitational area, but wider area as well. The open Aqua Park with all its content, will supply the customers with all sorts of services like those in world famous Open Aqua Parks, e.g. Costa Caribe, Marineland, Tropical Islands in Berlin etc.

Analysis of demand development in the following period


In the following period, it can be expected that the demand for fun, recreation, and relaxation and pastime services will rise. The customers are experiencing an escalation of the life standard, as well as a change in the consumer habits and preferences. Ever growing part of income is put aside for various services – fun, recreation, relaxation, etc. Also, the tendency of the service sector to grow is reflected in the growth of the demand for these services. With the growth of various forms of vacation, fun and recreation, there will be an increase of demand for additional services – tourist services, accommodation services, food services etc, which will have positive implications on an increased employment rate in Subotica, Palić and nearby towns, as well as an increased employment rate in Serbia in general. (Our estimation was that around 1100 employees would be indirectly employed.)

Furthermore, considering that the services of the Aqua Park are meant for the citizens of Serbia as well as nearby countries, we expect that the tourist inflow will have positive implications on the inflow of foreign currency as well.

Plan and sales opportunities


Conclusions about the sales options, i.e. profitability of the process of service providing and sale of the additional products in the open Aqua Park, were derived from a previously conducted detailed market analysis, i.e. analysis of the basic determinants of demand, analysis of competition prices, as well analysis of sales and success of the competition in the previous period and today which is described in detail in the previous chapters. After analyzing the supply and competition and subsequently projecting the demand development in the following period, we created the plan and sales options.

The described competition advantages we possess (the location of the open Aqua Park and the frequency of the road travel Horgoš-Novi Sad, the investment into the Palić Aqua Park, the exploitation of geothermal waters, the absence of direct competition in the surrounding region, the countries of former Yugoslavia, and others, the great potential of the target market and other previously mentioned advantages) helped us define the plan and possibilities of sale.

Considering all the analyzed and above mentioned parameters, we came to an assessment of the placement opportunities and the degree of capacity utilization per exploitation year.

Economical – financial analysis and estimation of the efficiency of investing in the Open Aqua Park on lake Palić


With the initiative of the “Zdravica” Company, Subotica, one of the founders of the new Aqua World Company, Subotica, an economical-financial analysis and efficiency estimation was conducted for the open Aqua Park. The basis for the analysis and the efficiency of investing is the content of the Aqua Park, the scope and structure of investments, elements for income forming and the expenses of the object. The applied methodology of the economical-financial analysis and efficiency of investment estimation was based on common procedures of surveying the investment efficiency (a methodology recommended and accepted by banks, investment funds, state development funds etc.). 

In the investment analysis we started from the total investment into the basic and working capital, and when it comes to sources and financing conditions, we started from personal  resources and financing based on credit. The basic indicators of business have been quantified (total income, expenses, gain, money flow, economy flow with and without financing expenses) based on which the relevant indicators of investment efficiency (current net value of the object, intern profitability rate, cost threshold, investment return limit etc). The analysis comprised an examination of the object’s sensitivity to changes of relevant starting measurements – total investments, total income and expenses.

Investing in fixed assets

For the realization of the project of building an open Aqua Park in Palić, constant investment was planned adding up to 5 300 000€, in the following amounts:
The scope and structure of investment in fixed assets
Description
Total investment
Land 2.4 million €
Buildings 400 000 €
Infrastructure 950 000€
Equipment 1 400 000€
Other 150 000 €
FIXED ASSETS 5 300 000 €

Projection of the total income and business cost


Total income

Starting from the indicators of market research and empirical parameters for existing Aqua Parks of a similar type in Europe, operating revenues was projected based on potential sales, or the potential number of annual visits and expected expenses per visitor. It was planned that the open Aqua Park stays in function 5 months per year, but seasonal factors were also considered, the factors which imply that the average annual time of active operation of the Aqua Park should be 120 days. The possible number of visitors in the initial phase of operation of the open Aqua Park was determined to be about 360 000, in the following way:


Total number of days
Number of visitors in one day
Total annual number of visitors
Average annual operational time of the Aqua Park
120
3000
360000
In total
120
3000
360000

The possible number of visitors per year in the initial stage of operation of the closed Aqua Park is determined to be about 500 000, in the following way:


Total inhabitants
Visitors participating
Number of visitors
Number of inhabitants within 80 km
1 852 000
11%
203 720
Number of inhabitants within 180km
2 762 717
5%
138 136
Number of inhabitants within 270km
2 225 722
1%
22 257
In total
6 840 439
7.35%
364 113

In the following years of the open Aqua Park operation (considering factors of season and capacity) about the same annual number of visitors is sustained – about 360 000 as shown below:

Projection year
Number of visitors
1
360 000
2
360 000
3
360 000
4
360 000
5
360 000
6
360 000
7
360 000
8+
360 000

Single expense per visitor of 11.5€, i.e. park income (without taxes) of 9.5€ has the following structure:

Daily expenses per visitor in euro’s
Daily income of the open Aqua Park per visitor in euro’s without taxes
Ticket
5
4.15
Food and drink
4
3.3
Purchase
2.5
2.05
In total
11.5
9.5

Based on everything explained above, a projection of the yearly income of the open Aqua Park is:

Year
Annual number of visitors
Income per visitor in euro’s
Total annual income in euro’s
1
360 000
9.5
3 420 000
2
360 000
9.5
3 420 000
3
360 000
9.5
3 420 000
4
360 000
9.5
3 420 000
5
360 000
9.5
3 420 000
6
360 000
9.5
3 420 000
7
360 000
9.5
3 420 000
8+
360 000
9.5
3 420 000

Projection of business expenses


- Direct material expenses are projected based on empirical parameters, with the participation of 15% of total income.

-Production services include maintenance costs and publicity cost and are projected based on empirical data – maintenance 10% and 5% of total revenue.



[1] The speaker is addressing to his business partners 

Нема коментара:

Постави коментар